Taken 3-Oct-16
Visitors 47


« Previous Next »
12 of 161 photos

'Kerne' Sutton Weaver swing bridge 3rd October 2016

'Kerne' passing Sutton Weaver after a small delay while a problem with the swing bridge was fixed. The rusty piles on the river bank were installed in 2015 for a temporary bridge which was used while the swing bridge was overhauled 03/10/16.
Canon EOS 5D Mark II, f/8 @ 40 mm, 1/500, ISO 200, No Flash

Categories & Keywords
Category:
Subcategory:
Subcategory Detail:
Keywords:

'Kerne' Sutton Weaver swing bridge 3rd October 2016